KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-2-2009
Number of Hours:  2.00
Manual Reference:  11-2
Brief Description:  Engine control cable installation

I started the day by finishing the cabin heater control cable installation. Then I moved on to the throttle control cable installation. I finished the morning session with the propeller control cable installation.
' style=

Cabin heat control cable installed

Cabin heat control cable installed

' style=

Throttle control cable installed

Throttle control cable installed

' style=

Propeller control cable installed

Propeller control cable installed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.